This week, 100 representatives from 34 states and interstates, along with representatives from EPA Headquarters and Regions, met in Atlanta, Georgia for a 3 ½ day stormwater meeting to discuss a number of challenging topics including writing permits that meet the small MS4 remand rule, meeting TMDL and other water quality based stormwater requirements in permits, defining Maximum Extent Practicable, developing “clear, specific, & measurable” requirements, using electronic permitting systems, increasing the value of oversight inspections, taking enforcement actions and assessing penalties, targeting sites for inspection, erosion and sediment control measures, the MSGP settlement and implication for states, residual designation authority, long term stormwater planning, unpermitted industries and no exposure certification, transportation and stormwater, illicit discharge detection and elimination, efficient and effective oversight of MS4 programs, post construction trends and findings, different approaches to ensuring BMP verification and effectiveness, tools and technology that can help permittees, and factors to consider when permitting unique facilities.
PDF copies of the presentations and handouts from the meeting are available upon request. Email srolland@acwa-us.org.
Final 2018 National Stormwater Roundtable Agenda 2-9-2018

